What is an EICR?
An Electrical Installation Condition Report is a periodic inspection and testing report for an existing fixed electrical installation, intended to assess whether it is safe for continued use within the agreed extent and limitations.
How often should homeowners have an EICR?
Traditional GN3 initial guidance for owner-occupied domestic accommodation is commonly expressed as change of occupancy / up to 10 years, but earlier inspection can be appropriate because of age, condition, alterations, damage or unknown history.
How often do landlords need an EICR in England?
Landlords covered by the relevant regulations generally need the fixed installation inspected and tested by a qualified person at least every five years, or sooner where the previous report specifies an earlier date.
Do I need a new EICR every time the tenant changes?
Not automatically under England’s landlord regulations. GOV.UK guidance says that if inspection/testing was carried out less than five years ago and the report does not require investigative or remedial work, a new inspection is not required solely because the premises are re-let. The current report must be given to the new tenant. GN3 professional guidance separately refers to change of occupancy.
What is the difference between GN3 guidance and England landlord law?
IET Guidance Note 3 contains professional technical recommendations, including recommended initial inspection frequencies. England’s landlord regulations create separate legal duties. A GN3 recommendation should not automatically be described as a statutory requirement.
What does C1 mean?
C1 means danger present: there is a risk of injury and immediate remedial action is necessary. A C1 observation makes the report unsatisfactory.
What does C2 mean?
C2 means potentially dangerous. A foreseeable fault or situation could create danger and urgent remedial action is necessary. A C2 observation makes the report unsatisfactory.
Does a C3 fail an EICR?
No. C3 means improvement recommended. C3 on its own does not make the EICR unsatisfactory.
What does FI mean in 2026?
BS 7671:2018+A4:2026 changed FI to “Further investigation is advised” and FI by itself does not affect the overall satisfactory/unsatisfactory assessment on the A4 model form. Older A3-era forms and current landlord guidance may still use the older “required without delay” wording, so the form/edition and any separate statutory landlord duties need to be read carefully.
Does an old fuse box fail an EICR?
No, not simply because it is old. The inspector assesses condition, protective measures, risk and the installation as a whole.
Does a plastic consumer unit fail an EICR?
No. A plastic enclosure alone does not automatically make an existing installation unsafe or an EICR unsatisfactory.
Does an installation have to comply with the latest BS 7671 to pass?
Not every older feature has to be upgraded simply because the latest edition contains newer requirements. The inspector assesses whether departures create immediate or potential danger and whether the installation is safe for continued use.
What is insulation resistance testing?
It is professional testing used to assess the condition of electrical insulation and detect unwanted leakage paths or deterioration that may not be visible during normal operation. Sensitive connected equipment must be properly considered.
What is a ring final circuit test?
It is a set of professional continuity/verification measurements used to assess the integrity and arrangement of a UK ring final circuit. It can reveal open conductors and abnormal interconnections that are not proven by a plug-in socket tester.
What is R1+R2?
R1 is the resistance of the circuit Line conductor and R2 is the resistance of the circuit protective conductor. R1+R2 gives useful information about the fault path/protective conductor and is interpreted with other results.
What are Ze and Zs?
Ze is external earth fault loop impedance at the origin; Zs is the earth fault loop impedance for a circuit. Both require interpretation in the context of the earthing arrangement and protective device.
How is an RCD tested?
A competent inspector uses appropriate test equipment and considers the RCD type, rating, application and measured performance. This guide intentionally does not provide step-by-step mains testing instructions.
How long does an EICR take?
There is no one correct time. It depends on property size, number of circuits/consumer units, access, condition, age, defects, alterations and the agreed inspection extent.
Does the electricity need to be turned off?
Temporary power interruption is normally required for parts of proper inspection and testing. Tell the inspector beforehand about critical equipment that needs planned shutdown or cannot be interrupted.
Is an EICR the same as PAT testing?
No. An EICR assesses the fixed installation; PAT/in-service equipment inspection relates to electrical equipment, plugs and flexible leads where appropriate.
Should I get an EICR before buying a house?
It is not always legally required, but it can be useful where the electrical history is unknown, the installation is old, certificates are missing or alterations/extensions may have been carried out.
Who is qualified to carry out an EICR?
The person needs competence in periodic inspection and testing, including relevant technical knowledge, practical experience, test equipment and the ability to interpret results and classification codes. Scheme/qualification requirements can provide useful evidence of competence.
How do I check whether an EICR inspector is competent?
Ask about inspection/testing qualifications, practical EICR experience, current BS 7671/GN3 knowledge, independent registration/assessment where applicable, maintained test instruments, insurance and their ability to explain findings and abnormal readings.
What happens after an unsatisfactory EICR?
The observations should be explained and appropriate remedial work planned. For covered landlords in England, required remedial/further investigative work is generally subject to a 28-day maximum or any shorter period specified as necessary in the report, with immediate danger treated urgently.
Does an unsatisfactory EICR mean the property needs rewiring?
No. The reason may be one or several specific defects that can be repaired. A recommendation for full rewiring should be technically justified by the actual condition and extent of the installation.